Project delivery
From door schedule and shop drawings to containerised site delivery
Managing 500+ hotel room doors requires zero guesswork. Our engineering team converts your architectural Door Schedule into numbered shop drawings, builds a physical 1:1 mock-up door for on-site approval, and ships each doorset individually crated by floor and room number for rapid installation.
Five stages, one approval gate
- 01
Schedule intake
Your architectural Door Schedule, in Excel or PDF, with lock, hardware and fire rating requirements.
- 02
Engineering review
We check every door type for manufacturability, fire and acoustic compliance, and flag anything that cannot be delivered as scheduled.
- 03
Numbered shop drawings
One drawing per door type, showing leaf, frame, lock position, hinge positions and the section detail.
- 04
1:1 mock-up
A physical full-size door, frame and hardware assembly, built and sent for on-site approval.
- 05
Production and delivery
Batch production against the approved mock-up, crated by floor and room number, with an as-built drawing set.
What you receive
| Deliverable | Format | When |
|---|---|---|
| Door schedule | Excel + PDF, numbered by door type | Day 3 |
| Shop drawings | PDF + DWG per door type | Day 7 |
| Compliance matrix | PDF, one row per door | Day 5 |
| 1:1 mock-up | Physical sample, shipped | Day 20 |
| As-built drawing set | PDF + DWG, per project | With the final shipment |
| Packing list | PDF, by container and room number | With the final shipment |
| Test reports | PDF, per rated model | On request, before production |
The mock-up is the approval gate
One full-size door, built and shipped, removes an entire category of dispute. If the client signs the mock-up, the batch is made against it and the signed mock-up is retained at the factory as the master. It costs two weeks at the start of a twelve-week programme and saves the twelve weeks.
- Full-size door, frame and hardware, not a laminated board sample
- Signed mock-up retained at the factory as the production master
- Colour, texture, hardware and lock operation all approved in one gate
- Mock-up credit against the production order
Send the schedule
Day 3 you will have a numbered doorset list back, with anything that cannot be made flagged.